Eugene Sawyer Water Purification Plant – Chicago, IL

Engineering Design Services


The purpose of the Eugene Sawyer Water Purification Plant (ESWPP) Chemical Building Switchgear Replacement is to improve the electrical power distribution system at the Chemical Building. The scope includes replacing the existing switchgear with more modern switchgear options in a new electrical room and expanding the switchboard with new sections and required branch circuit breakers. As Prime Consultant, AAA Engineering managed the subconsultants responsible for other disciplines including architectural, structural design, environmental testing and SCADA.

Construction Managment services include phasing plans and schedules to provide minimum impact on the transition of power distribution to maintain the operation of existing plant equipment throughout the project’s construction.